MELAKA RIVER REHABILITATION AND BEAUTIFICATION PROJECT

DESCRIPTION

The main objective of the project is to improve the overall condition of Sungai Melaka and its riverine environment by creating a world class river front that recaptures the characteristics of old Melaka. The firm undertakes the study, design and construction supervision of the following:

  • Hydrologic and hydraulic modelling of Sungai Melaka to ascertain the impact of river embankment works
  • River embankment wall to stabilise and beautify the river banks, and boardwalk for nature conservation
  • Surface drainage improvement works and interfacing with river embankment works
  • Sewer interceptor systems and sewage treatment plant
  • Minor dredging of Sungai Melaka
  • Storm water pump station to solve localised flooding
  • Bridge to CIQ Complex
  • Tidal analysis and design of tidal barrage

This project was selected as a winner of the Special Category Award 2009 by the Pertubuhan Arkitek Malaysia (PAM).

SERVICE PROVIDED

EIA, detailed design and construction supervision.

PROJECT DATA

Client

Pembinaan Kaleigh Sdn Bhd Pesona Metro Sdn Bhd JV

Location

Melaka, Malaysia

Commencement Year

2004

Completion Year

2006

Construction Cost

RM92 million