KVMRT PROJECT LINE 2: SUNGAI BULOH – SERDANG – PUTRAJAYA M&E WORKS FOR SERDANG DEPOT

SMHB is the consultant for the scheme design of the Serdang Depot that is part of the Klang Valley Mass Rapid Transit (KVMRT) Sungai Buloh – Serdang – Putrajaya also known as Line 2. However, due to contract packaging by the client, the detailed design work for Serdang Depot was awarded to other consultant but subsequently, SMHB was appointed to provide consultancy services for M&E detailed design and HOD during construction stage.

The depot is located at Serdang occupying 39 hectares of land. Facilities include rectifier building, electric train stabling with covered platform, vehicle cleaning and inspection facility, train light and heavy maintenance workshops, train body wash plant, test track, storage area, office building and other associated facilities.

SMHB provided M&E design services for the Stabling Yard (such as air conditioning, hot/cold water, sanitary plumbing, HV and LV system, earthing and lightning protection system and small power) and design interface with system that include liaison with the System’s Consultants to ascertain their requirements and provide M&E design accordingly.

SERVICES PROVIDED

Detailed design (M&E) and HOD

PROJECT DATA

Client

MMC Corporation Bhd-Gamuda Bhd Joint Venture

Associate Firm

Produktif Sepakat Consulting Services Sdn Bhd (Lead Consultant)

Location

Klang Valley, Malaysia

Commencement Year

4/2015

Completion Year

7/2018

Project Cost/Cost of Study

RM450,000,000.00 (est.)

(M&E RM130,000,000.00)