EAST KLANG VALLEY EXPRESSWAY (EKVE) – EASTERN ROUTE

DESCRIPTION

The East Klang Valley Expressway (EKVE) forms part of the Kuala Lumpur Outer Ring Road (KLORR) network in the east. The expressway traverses northwards from Kajang SILK Highway passing through the outskirts of Bandar Mahkota Cheras in Kajang and ends at Middle Ring Road 2 via Jalan Ukay Perdana in Ampang.

EKVE spans approximately 39 km (24km mainline and 15 km spur roads) and is a dual carriageway, two (2) lanes in each direction and expandable to three (3) lanes. A closed toll system and designed to accommodate five (5) toll plazas at each of the planned five interchanges along the entire expressway. The five interchanges are:

  • Sungai Long Interchange
  • Bandar Mahkota Cheras Interchange
  • Hulu Langat Interchange
  • Ampang Interchange
  • Ukay Perdana Interchange

SMHB was appointed as support consultant for engineering design works for parts of Package 1 and Package 2 of the project. It involves design of 16 nos. of Bridges; specifically Ampang Interchange including Ampang Spur Road, and Ukay Perdana Interchange.

SERVICES PROVIDED

Detailed engineering design and construction supervision

PROJECT DATA

Client

EKVE Sdn Bhd

Associate Firm

AZRB Sdn Bhd

Location

Selangor, Malaysia

Commencement

7/2013

Completion

2018

Project Cost/Cost of Study

RM240,000,000