SMHB has wide experience in the following
categories:
Mechanical
- Pumping systems
- Surge protection
- Intake screens & gates
- Air conditioning and ventilation
- Lifts and hoists
- Fire protection
- Cranes
- Diesel engines
- Water/wastewater treatment
- Sprinker system
Electrical
- Substation
- Stepdown transformers
- Motors
- External distribution systems
- External and Internal Lighting
and Small Power
- Generators
- Telecommunication systems
- Control instrumentation
- Telemetry and supervisory control
- Security systems
- Lightning protection
- Cathodic protection
|


|
Range of installation size:
- Pumping stations with capacities up
to 1,000 mld and electric motors up to 3 MW
- Surge suppression systems
using surge vessels up to 198 cubic meter steel
pressure vessels
- Intelligent fire-fighting system
using Co2, Argonite and foam system
- Barrage gates with sizes up
to 7 m x 3 m
- Diesel power generator station up
to 10 MW
- Electrical power distribution systems
up to 33 kV
- Fully automated PLC based water
and wastewater treatment plants
- SCADA system involving input/output
point ranging from hundreds of points up to 10,000 points
- Swimming
pool (compliance to FINA standard) including a moving floor system
for the training pool
Typical Projects
- Rehabiltiation and Upgrading
of the Semenyih Water Treatment Works
- Sungai Selangor Water Supply
System Phase 3 – Raw and Treated Water Pumping Stations
- Kerteh Integrated Petroleum
Complex, Dungun Water Supply Project – Raw and Treated Water
Pumping Stations
- Sungai Selangor Water Supply
Scheme Phase 2 -Building Services and Treated Water Pumping
Stations
- Tunnel Management System for
Putrajaya Common Utility Tunnel
- Sungai Semenyih Water Supply
Scheme - Rehabilitation and Upgrading Works
- Bus and Taxi Terminal at Precinct
1 and 9, Putrajaya
- Old Bertam Treatment Work
Rehabilitation, Melaka
- Bukit Tunggul Golf and Country
Resort
|